hf.co/mradermacher/OpenAI-gpt-oss-20B-Claude-4.5-Opus-Heretic-Uncensored-i1-GGUF:Q4_0
mradermacher · Q4_0 · on ollama · derivative build
A change to gpt-oss 20B by somebody other than its vendor. Nothing the vendor proved carries over; every number here was measured on these weights.
safety training removed — the repo name says so (abliterated / uncensored); never routed to by default
Measured by one node on hardware we do not own, and signed by each of them. What machines here actually proved — never what the card claims.
matrix built 29 Oct 2026 · every field verified against the signature of the node that produced it, and re-verifiable by you: each signed figure carries the exact bytes the node signed (signing_payload_b64) and the signature over them, and the ed25519 public key is embedded in node_did. effective_ctx is the context length a node PROVED by recall, never the length a model card advertisesNone of the 10 languages asked came back correctly.
Each question was put entirely in its own language and script, and the answer had to be right. A model with no coverage cannot parse the question, so answering in English is a failure here, not a pass. 0 proved of 10 asked — a language absent from the probe set was never asked, and is not a claim either way.
How far back it remembers, machine by machine
Filled: the needle came back at that prompt size · outlined: asked and lost · blank: not asked · trained for 128K. 1 walk ended because the model forgot, 0 because the machine could not hold the prompt.
| machine · build | 4K | why it stopped |
|---|---|---|
| Amit KhetanLinux, CPU only · 4 CPUs · Q4_0 by mradermacher | — the model lost the needle at 4K |
Carbon per million tokens
Lowest build on each machine · 0 of 1 read off a power sensor, the rest modelled from the parts · fewer grams is better
Carbon is location-based: signed energy × the yearly average of the grid where the machine signed its place (EU grid average (applied to NL); Ember Global Electricity Review 2025 (2024 generation), location-based). Facility overhead is not included. A machine on its own solar is not credited until it can prove it.
Tell us the workload, whose machines it should run on, and which jurisdiction it answers to.